SEYCHELLES
INSTALLING THE FAN
Tools Required:
Phillips screwdriver, Blade screwdriver, 10 mm wrench, step ladder, and wire cutters.
INSTALLATION PREPARATION
1
To prevent personal injury and da-
mage, ensure that the hanging loca-
tion allows the blades a clearance
of 7.5 feet from the floor and 2.5
feet from any wall or obstruction.
blade
2.5
feet
7.5 feet
HANGING BRACKET INSTALLATION
Turn off circuit breakers to current fixture from breaker panel and be sure operating light switch is turned to the OFF
position. WARNING: Failure to disconnect power supply prior to installation may result in serious injury.
1
For concrete ceiling, drill two holes in the
ceiling and secure the mounting bracket
to the ceiling with two Φ0.32" (8mm)
(distance between the two holes should
be appropriate) expansion screws, flat
washers,nuts provided and tighten with
a spanner.
2
For wood ceiling, Secure the mounting
bracket to the ceiling is capable of carr-
ying a load of at least 100lbs (45kg) with
two long mounting screws and washers
provided. Be sure at least 0.12"(30mm) of
the screw is threaded into the support.
16
INSTALLATION MANUAL
2
This fan can be mounted with a downrod on a regular (no-slope) or vaulted
ceiling. Other installation,such as flushmount, is not available for this fan.
Downrod installation
IMH-100 v.01
Roof mount
installation
Vaulted ceiling angle
is not to exceed
15 degrees
hofflights.com