IZAR CENTER
Modem, PC
Connection to socket 67 Use the supplied interface
cable (maximum cable length 10m).
USB
Use the supplied USB cable (maximum cable length
3 m).
(Connection example see fig. II.)
8.
Display elements
Five LEDs on the front side of the IZAR CENTER show the
corresponding operational conditions.
M-Bus
Display
Operational condition
green
0 ... 100 % bus load
yellow
100 ... 130 % bus load (warning)
The maximum M-Bus performance is
achieved. Do not connect further M-Bus
meters. The IZAR CENTER is fully opera-
tional in this condition.
red
Overload
In this case, too many M-Bus meter
are connected or the bus wires have a
short-circuit.
If there is a bus overload, the M-Bus volt-
age is switched off for 2 seconds. Then the
bus supply is checked and is also switched
off if required.
- 16 -
English