Diehl IZAR CENTER Guide D'installation page 13

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English
5.
Instructions
The device must be installed and used in firm
compliance with the specified rules in the pres-
ent technical description.
Any manipulation or installation, that is not properly car-
ried out and does not correspond to the mentioned reg-
ulations, obviates any responsibility on the part of Diehl
Metering. In this case, the responsibility lies solely with
the originator.
The IZAR CENTER should be mounted and put
into operation by qualified experts only.
6.
Installation / removal
Before every installation or removal the power
supply (socket 16, fig. I) must be interrupted.
Install IZAR CENTER
ƒ
Snap the IZAR CENTER onto the hat rail. The black
safety catch (socket 65, fig. I) must point downwards
and engage audibly.
Remove IZAR CENTER
ƒ
Use a pointed object (e.g. screwdriver) and pull the
black safety catch on the lower edge of the IZAR
CENTERs downwards.
IZAR CENTER
- 13 -

Publicité

Table des Matières
loading

Produits Connexes pour Diehl IZAR CENTER

Table des Matières