Toto Nexus TS794PV Manuel D'installation Et D'utilisation page 6

Masquer les pouces Voir aussi pour Nexus TS794PV:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4b. attach nut securely into the pressure
balance valve.
secure the canopy onto the
coverplate with set screw.
temporarily install the handle
adapter onto the valve stem and
the handle onto the adapter.
5. install the handle onto the valve stem
using supplied screw. Measure the
distance from point a on the lever to
point B on the canopy. subtract 1/16"
from this measurement to obtain the
amount of valve stem to cut off
6. Ex. if the distance between a & B is 1",
amount to cut off = 1"–1/16" = 15/16"
Mark the amount to cut off from the end
of the valve stem.
6

Publicité

Table des Matières
loading

Table des Matières