IMEON ENERGY IM-4850DA Guide D'installation page 21

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Guide d'installation/ Installation guide
IM-4850DA
2.1. Recommended equipment for the installation
This section does not specify the protective equipment necessary for the intervention and the intervener himself.
The qualification of the worker and the protective equipment must comply with the standards and regulations in force.
The following equipment is recommended for the installation:
o
Screwdriver (flat and crosshead)
o
Multimeter
2.2. Installation
Step 1 - Unpacking
Unpack the battery carefully. Batteries are heavy. Do not lift them by their onnectors or cables. Check the contents of
the box (see §2.2).
EN
Step 2 - Preparation of the installation
FR
FR
Make sure the ON/OFF switch on the front panel of the IMEON battery is in the "OFF" state to prevent live operation.
Step 3 - Mechanical installation
Cabinet installation
1. Place the IMEON battery on the cabinet bracket as shown in the diagram and
push it into the cabinet to the installation position.
2. Secure the IMEON battery to the cabinet with a nut through the mounting
holes located on the battery's suspension lugs.
Step 4 - Electrical installation : Grounding and
communication
Screw the earth cable between each battery
Connect one of the batteries to the Ground
Connect the long communication cable between the master
battery "CAN / 485 IN" port to the inverter "CAN" port.
Connect the short communication cables between "OUT" port
of the battery to the "IN" port of the next battery (the last
battery must not have a cable on the OUT port)
Set all DIP switches of each battery to the OFF position excepts DIP 3 of the master battery to the ON position.
IM4850DA_guide_installation_v.A.4
Master battery setting
Slave battery setting
21/ 24

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour IMEON ENERGY IM-4850DA

Table des Matières