General Terms & Conditions; Before Starting - IMEON ENERGY IM-4850DA Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Guide d'installation/ Installation guide
IM-4850DA
General terms & conditions
BEFORE STARTING: Read this manual carefully, it will guide you through the installation and verification before you start
using the system.
In the interest of continuous improvement, the content of this document is reviewed and modified on an ongoing
basis without notice.
Please refer to the IMEON ENERGY website (https://imeon-energy.com) for the latest updated version. The images in
this document are for illustration purposes only and may differ. Please note that the installation guide is available in
different languages, in case of misunderstanding, the French version will prevail.
CAUTION: This guide is intended for specialized installers with extensive knowledge and experience in battery
installation and power distribution. It is strictly forbidden to install (or dismantle) this system if the required skills
are not acquired.The installation must be carried out in accordance with the regulations in force.
General Precautions
EN
Do not expose the battery to water or any source of moisture.
Do not expose the battery to fire or any source of heat.
FR
FR
Please do not pierce, hit or damage the battery in any way.
Please do not use batteries from different manufacturers, or different types/models, as well as new and old
batteries.
Please make sure that the storage and usage environment is optimal for the device to function properly.
Please do not use the battery if it is in error, emits odor, heat, is deformed or if you notice any other
abnormality. If the battery is used or charged, stop using it immediately.
If the battery is stored for a long time, it should be recharged every 6 months and the SOC (State of Charge)
should not be less than 80%.
If an abnormal event occurs, please contact the supplier.
Warning
1.
After opening the package, check the battery and its accessories. If the product is damaged, or any parts are
missing, please contact your local supplier.
2.
Before installation, please make sure that you have turned off the power supply and that the battery is turned off.
3.
The wiring must be done correctly,
4.
It is NOT allowed to connect the battery and AC power directly.
5.
The battery management system (BMS) is designed for 48V. It must not be connected in series.
6.
The battery system must be properly grounded; the resistance must be less than 1 Ω.
7.
Please make sure that the technical specifications (technical performance, communication protocol
compatibility...) of the battery match the equipment you want to associate them with.
8.
If you need to move the battery, the power must be completely cut off.
9.
It is strictly forbidden to connect the battery to other battery systems.
10. It is strictly forbidden to connect the battery to a defective or incompatible inverter.
11. It is strictly forbidden to open, repair or disassemble the battery.
12. In case of fire, please use only a dry powder fire extinguisher.
The supplier is not liable for damage caused by improper maintenance or failure to follow the instructions in this
installation guide.
IM4850DA_guide_installation_v.A.4
15/ 24

Publicité

Chapitres

Table des Matières
loading

Produits Connexes pour IMEON ENERGY IM-4850DA

Table des Matières