Heat & Glo Vienna I Guide D'installation page 22

Table des Matières

Publicité

Installing the Stove
Continue adding vent
components, locking each
succeeding component into
place.
3. Install Support Brackets
For Horizontal Runs - The vent system must be
supported every 5 feet (1.5m) of horizontal run by a
horizontal pipe support.
To install support brackets for
horizontal runs:
• Place the pipe supports
around the vent pipe.
• Nail the pipe supports to the
framing members.
For Vertical Runs - The vent
system must be supported
every 8 feet (2.4m) above the
stove vent outlet by wall
brackets.
To install support brackets for
vertical runs:
• Attach wall brackets to the
vent pipe and secure the
wall bracket to the framing
members with nails or
screws.
(continued)
Figure 12. Adding
Venting Components
1 INCH MIN.
(25.4mm)
D'ÉCHAPPEMENT)
Figure 13. Installing
Support Brackets
Installation
Figure 12.
Ajout de sections
3. Pose des supports de montage
Sections horizontales - Le système de ventilation doit
être soutenu par un support horizontal tous les 1,5 m (5
ft) de conduit horizontal.
WALL
BRACKET
(SUPPORT MURAL)
WALL STUD
(MONTANT DU MUR)
8 ft
(2.4mm)
VENT OUTLET
(ORIFICE
Figure 13.
Pose des supports de montage
26
(suite)
Continuer à ajouter des
sections et à les verrouiller
successivement.
Pour poser des supports de
conduit horizontal:
• Placer les supports autour
du conduit.
• Clouer les supports dans
les
montants
charpente.
Sections verticales - Le
système de ventilation doit
être
soutenu
supports accrochés aux
murs tous les 2,4 m (8 ft) au-
dessus
de
d'échappement de l'appareil
de chauffage.
Pour poser les supports de
conduit vertical:
• Attacher les supports
muraux sur le conduit et
les clouer ou visser sur les
montants de la charpente.
de
la
par
des
l'orifice

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Vienna ii

Table des Matières