Télécharger Imprimer la page

Graf Jet 700 Mode D'emploi Et D'entretien page 8

Publicité

Les langues disponibles

Les langues disponibles

GB
7. EU Certificate of Conformity
Otto GRAF GmbH Kunststofferzeugnisse, Carl-Zeiss-Str.2-6 – D-79331 Teningen, certifies that
the products to which this certificate of conformity refers comply with the following EEC health
and safety directives:
98/37/EC 89/336/EC 73/23/EC 00/14 EC
In order to adequately meet the above-mentioned EEC health and safety directives, the following
standards were referred to: EN60335-1, EN 60335-2-41, EN 292-1, EN 292-2, EN 61000-3-2, EN
61000-3-3, EN 55014-1, EN 55014-2, EN 3744.
Teningen, 30.03.2004
Attention:
1.
This product has been packed correctly and contains:
- A 500 or 700 jet pump
- Installation and instruction booklet
2.
Open the goods on receipt and check for faults.
3.
Claims for damage during transport cannot be accepted unless they are made in
writing within 48 hours and signed by the haulier. Returns will only be accepted of the
pump is packed in its original packaging!
4.
Never let the pump run dry.
5.
Fill the pump and suction hose with water before use.
6.
Never place the pump vertically as this will obstruct the motor cooling air intake.
Always place it horizontally on a firm surface.
Arne Schröder, Produktmanager, Otto Graf GmbH
8

Publicité

loading

Ce manuel est également adapté pour:

Jet 500