Fcc Statement; Before You Begin - Vollrath Mirage Série Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FCC STATEMENT

This equipment has been tested and found to comply with Part 18 of
FCC Rules. These limits are designed to provide reasonable protection
against harmful interference in a residential installation. This equipment
generates, uses and can radiate radio frequency energy and, if not
installed and used in accordance with the instructions, may cause
harmful interference to radio communications. However, there is no
guarantee that interference will not occur in a particular installation. If
this equipment does cause harmful interference to radio or television
reception, which can be determined by turning the equipment off and
on, the user is encouraged to try to correct the interference by one or
more of the following measures:
• Reorient or relocate the receiving antenna
• Increase the separation between the equipment and receiver
• Connect the equipment into an outlet on a circuit different from that
to which the receiver is connected
• Consult the dealer or an experienced radio/TV technician for help
To assure continued compliance, any changes or modifications not
expressly approved by the party Responsible for compliance could void
the user's authority to operate this equipment.
2
INSTALLATION

Before you begin

1. Download the specification sheet for your drop-in from
Vollrath.com. You will need to refer to this document for
dimensions, clearance, venting and power requirements.
2. Verify the proper electrical outlet is available at the installation site.
NOTICE: This equipment requires a dedicated circuit.
NOTICE: Using a voltage other than the nameplate rated voltage
will cause damage to the unit. Incorrect voltage,
modification to the power cord or electrical components
can damage unit and will void the warranty.
3. Know the countertop manufacturer's requirements for preparing and
installing equipment into the countertop prior to starting installation.
Prepare the Countertop and Cabinet
NOTICE: Refer to the drop-in specification sheet for cutout
dimensions, air flow and venting requirements, minimum
clearance distances and environment requirements.
NOTICE: Countertop materials require specific preparation. Refer to
the countertop manufacturer for instructions regarding
proper installation of equipment into the material.
NOTICE: Exposed wood or particle board edges must be sealed with
an appropriate waterproofing material. Seal the edge
between the glass and the countertop with silicone or
similar material. Failure to do so may result in damage to
the countertop.
1. Cut required openings in the countertop and cabinet.
2. Clean debris from the cut out area(s).
3. Reinforce the countertop support as needed per the countertop
manufacturer guidelines and the weight of the equipment.
Mount the Drop-in
1. Choose a flat, level countertop for the mounting surface.
2. Measure the area for the cutout, including the countersink area. The
unit is designed to be countersunk. The depth of the surface around
the cutout must be reduced to allow for the countersink. See the
specification sheet.
Mount the Control Box
1. Measure the area for the control box cutout.
2. Apply sealant to the space between the control box and the
mounting surface to prevent moisture penetration.
3. Secure the control box to the mounting surface.
4. Plug the USB cable from the control box into the bottom of the
range.
®
Mirage
Induction Drop-in Warmers Operator's Manual

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

5950145595017059641596425964359645

Table des Matières