Installation; Location Of The Base Station - REMEHA iBase RF Guide D'utilisation

Masquer les pouces Voir aussi pour iBase RF:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3 Installation

3.1 Location of the Base station

The Base station is positioned on the wall near the boiler. Points to note:
-
Position the Base station in such a way that the boiler is not located between the
Base station and the iSense RF; doing so can negatively impact the connection
signal.
-
Position the Base station at least 1 metre from equipment with electromagnetic
emissions such as ventilation units, washing machines, dryers etc.
-
Position the Base station so that it has good reception.
To do this, use the signal strength indicator in the iSense RF. The signal strength can be
viewed via Menu > Information.
 iSense RF wireless range
The range of the iSense RF in buildings is generally 30 metres.
Note!
This value is purely an indication. The actual range of the RF signal depends strongly
on the local environment. Remember that the number of walls and ceilings (metal or
other wise) can have a (considerable) impact on reception. Other objects that contain
metal may also impact reception. These include mirrors and windows with a metal
coating, insulating films, tumble driers, washing machines, etc.
EN
23

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ibase

Table des Matières