Danby DKC5811BSL-2 Guide D'utilisation Et D'entretien page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Beer Keg Installation Instructions
INSTALLATION OF CO2
AIR LINE HOSE TO
REGULATOR
INSTALLATION OF THE
BEER TOWER
INSTALLATION OF
PROTECTIVE METAL
PLATE
INSTALLATION OF THE
BEER KEG
INSTALLATION OF THE
KEG COUPLER
• Attach the open end of the coloured hose to the hose barb connection on
the regulator
• Secure hose by using one clamp provided. Use pliers/screwdriver to
tighten clamp to prevent leaks. (See Figure 3)
• Remove the top plug by twisting and pulling out, saving it for later use if
you decide to convert unit to an all refrigerator unit.
• Unravel the beer line (clear hose) from the tower and insert the beer line
and wing nut through the uncovered hole on top.
• Lock the beer tower assembly to the top and make sure to position the
beer faucet so it is aligned with the cabinet front (6 o'clock position). You
accomplish this by aligning the bottom of the beer tower to the 3 grooves
on the top cabinet and tighten by hand clockwise to properly lock.
• The plastic gasket, can be used to make the connection between the
tower and the cooler tighter if needed. If Beer Tower will not turn to lock
in place, try removing the plastic gasket.
• This plate should always be installed when the keg is in place to protect
against unnecessary damage to the floor of the cabinet.
• Position the beer keg directly in front of the open door. Using keg
handles only, carefully lift the beer keg. (See Figure 5)
• To place the beer keg inside the cabinet, brace your knees behind the
beer keg. Lift the front of the keg just enough so the front edge of the
keg is resting on the front edge of the Beer Dispenser bottom cabinet.
(See Figure 6)
• Grasp the keg handles and slide it all the way into the cabinet.
Note: When inserting the keg into the unit, two (2) people should lift
the keg.
Figure 4
• Insert the keg coupler provided into the locking neck of the beer keg and
turn it clockwise to lock into position, making sure the keg coupler is in
the closed position. (See Figure 7)
Figure 5
9
Figure 6

Publicité

Table des Matières
loading

Table des Matières