3. Installation of energy meter
Wall mounting
Spacer holder
• It is recommended that shut-off valves are fitted before and after the energy meter to simplify removing the meter.
• The meter should be installed in a conveniently accessible position for service and operating personnel.
• Initial operation is to be carried out and recorded after installation.
31