Internet Services Activation; Gateway Status - elco REMOCON NET Notice Technique D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 16

Internet Services Activation

Gateway status

Connection through GPRS gate-
way
When using a GPRS gateway,
please follow the procedure below
to connect REMOCON NET to in-
ternet.
1. Power on the gateway and press
the ON/OFF button. For few
minutes the gateway performs its
startup procedure, during which
all LEDs will fl ash a blue se-
quence. At its conclusion, the
WEB led remains off , while the
BUS remains on.
Once the procedure is done, the
2.
WEB led will show the strength of
the GPRS signal as follows:
Internet Services Activation
Service Centres
Service Centres can access to
REMOCON NET platform typing
their log-in credentials on page:
https://www.remocon-net.remotethermo.com
For further information, please con-
tact ELCO
https://www.remocon-net.remotethermo.com
Gateway status
The three LEDs on the front cover of the gateway will allow you to receive a continuous feedback regarding the
status of the whole REMOCON NET platform. The following tables describe the meaning of each different col-
our that the three LEDs could show:
ADSL GATEWAY
WEB led
OFF
Steady green
Flashing green
Steady red
BUS led (BridgeNet)
OFF
Steady green
Steady red
ALL THREE LEDs TOGETHER
OFF
Flashing blue
Steady blue → Max signal strength
Flashing blue→ Medium strength
Flashing red→ Low strength
Steady red → No line
2. Note: we suggest to place the
gateway so that the Max intensity
of the GPRS signal is reached.
Moreover, it is possible to use the
external antenna kit, provided by
ELCO
3. Press and hold the start-up but-
ton until the WEB led starts to
flash a green light: the gateway is
now trying to automatically con-
nect to the ELCO server.
End users
End users can control their ELCO
products
smartphones
REMOCON NET App on Apple
Store or Google Play.
Furthermore, it is also possible to
use any internet device accessing
the REMOCON NET page at:
Gateway OFF or not powered
Gateway properly configured and connected
Gateway waiting to be set up
Gateway not configured, or ADSL connection not available
Gateway OFF
Bus BridgeNet working correctly
Bus BridgeNet error or cable not connected
Gateway OFF
Gateway startup procedure ongoing
If the procedure has been suc-
cessful, the WEB led will remain
green and the process is com-
plete.
Note:
In case of failure (WEB led red),
repeat the above procedure start-
ing from point 3.
Important:
Please begin the previously de-
scribed procedure once the gate-
way has been linked to the heat-
ing System
Bridge-Net
the gateway won't be able to con-
nect to internet.
through
their
downloading
the
28
through the Bus
protocol,
otherwise

Publicité

Table des Matières
loading

Table des Matières