EN
•
To close off the valve to inflate the board, make sure that the center valve pin is in the "UP"
position. If it is in the "DOWN" position, press down on the valve pin until it pops up.
•
To open the valve for deflation, press down on the valve pin.
•
Be careful of any sand or debris around the valve area when deflating as small particles could
become airborne with the release of the air pressure.
•
Always lock the valve with the cap when in use. This will prevent accidental air release and
entrance of any particles into the SUP.
4. iSUP Board Inflating Steps
1. Unscrew the valve cap. Raise the center button of the valve by turning in counterclockwise
direction. It is in the ''UP'' when it stands.
2. Connect the pump nozzle into the valve receptacle. The specific nozzle connects by a quarter turn
into the valve.
3. Start pumping air into the board by sliding the pump piston up and down, your pump inflates in
both directions, when you go up as well as when you lower the piston. Inflate until you reach the
required pressure. The appropriate pressure for this product is 15 psi / 1 bar. Minimum 12psi for
proper ISUP operating use and maximum of 15psi for this product. When you feel that the
inflation becomes harder, remove the cap (A), your pump only inflates in one direction, it will then
be easier to finish the inflation (only for the double action pumps).
4. After inflation, tighten the valve cap. Only the valve cap can ensure air tightness.
WARNING : do not over inflate beyond 15psi. This will render your warranty null and void.
30
TIP: If the pump piston starts to squeak,
apply some spray silicone or vaseline on the piston shaft.