2. Fin installation
Once the board is inflated, slide in the large Center Fin to the base and insert the fixed pin.
A
B
3. Operating Valve
Follow the instructions below for operating the Valve and the inflation and deflation procedures.
The valve is located at the end of the board (front side).
1
3
2
C
Valve diagram:
1 . Valve cap
2 . Pin
3 . Valve base
EN
29