Assembly recommendations
Please drill pilot holes for all screw connections to avoid damaging the wood. The following symbol in the
instructions will indicate when this is necessary:
General assembly of the wall elements
Figure shows a cross-section through a wall
section with profile wood boarding on both sides.
All wall elements are equipped with a vapour
barrier and heat insulation. After assembly of
the sauna, the vapour barrier must always be
located directly behind the interior boarding.
A
The inner side of the wall element is
indicated on the wooden frame by the
following stamp
innen → .
inside-= innen
Before erecting the individual elements, take
care to ensure that the groove side
(viewed from outside) is always on the left.
Mounting timber has been incorporated into the
wall elements for the bench mountings.
These are located approx. 36 cm and 80 cm above
the floor. The location of this timber can be seen
at the visible screw heads in the element frames.
Each time you install a wall element, ensure that these screw heads are located in the lower half of
the element.
The lower section of the supply air element contains a moveable air vent which makes it possible to achieve
optimal air supply in the sauna, irrespective of furnace type.
A moveable profile board above the small slit near
the control unit provides you with easy access to the
empty tubing. These serve as assembly tubing for the
mains connection electric cable, the sauna lamp and the
sauna furnace ending at the control unit.
R1 : Mains connection control unit
R2 : Control unit sauna lamp electrical cable
R3 : Cables for temperature sensors
R4 : Sauna furnace control unit
R5 : Vaporiser control unit cable
(Only with sauna steam bath combi furnaces)
Electric cables and a sauna lamp
are not included in the scope of the
delivery but are available as accessories.
The sauna can also be built in its mirror image.
To prevent the dropping of the glass door,
tighten the allen screw of the braces firmly.
Note:
The long hole in pos. 14 is required for the cable penetration above the supply air element.
The assembly of the bargeboards pos 29 should only be carried out once the electric cable has been laid.