Broan InVent AE80S Directives D'installation, D'utilisation Et D'entretien page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Connect wiring.
Bend tab to expose desired access hole. Connect
power cable to housing with appropriate UL approved
connector. Connect wires per diagram on page 8. Re-
install wiring panel and secure with screw from parts
bag.
6. Mount housing to ceiling
structure.
Mount housing to ceiling structure with standard
drywall or wood screws in 3 locations shown. The
humidity control panel assembly must be removed to
access one of the locations.
CAUTION
• DO NOT TOUCH THE HUMIDITY-
SENSING CIRCUIT BOARD.
Electrostatic discharge may damage
the circuit board.
7. Connect 4-in. round duct.
Pull existing ducting through housing discharge
opening.
Attach and tape ducting to duct connector.
Push connector/ducting back through opening.
Engage tabs and secure with screw from parts
bag.
2
4
Install blower. Finish ceiling, then
install grille.
See Steps 7, 8 & 9 on Page 6.
(Step 8 is only necessary in RETROFIT
installations if ceiling requires repair.)
3
1
TABS
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Invent ae110s

Table des Matières