Connecting The Tubing - vitapur VRO-3 Guide D'installation, Utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

C
onneCting tHe
CAUTION: Before cutting the supplied tubing measure the distance between the components.
All tubing is colour coded for ease of installation.
All connection points are colour coded with a tab block: white, yellow, blue and black.
¼" Black – Connects the waste water from the RO membrane to the Air Gap faucet intake line
¼" White – Connects the tap water to the sediment pre-filter
3/8" Yellow – Connects the RO membrane to the holding tank
3/8" Blue – Connects the carbon post filter to the faucet
3/8" Black – Connects from Air Gap Faucet to saddle drain
Each connection point has coloured plugs to match the colour of the
tubing that connects at that point. The plugs must be removed before
installing the tubing. Push in the collar and pull the plug out.
Quick connect fittings are used throughout the system. To insure an
optimal seal, tubing should be cut with the end square. An angled
cut or distortion of the tubing will not provide a proper seal and may
cause leaks.
To install a tube, push in the collet until unit seats firmly. To remove a
tube, push in the collet and pull out the tube.
Reference the diagram below for colour and connection point in the RO System.
Pressure Tank
3.2 U.S. Gallons
t
:
ubing
Counter top
Line to drain
¼" White Line
Yellow Line
Air Gap Faucet
Blue Line
Flow Restrictor 300ml
¼" Black
Drain Line
to Drain
Black
13
Insert Tubing Into Collet
Push in blue horseshoe to secure tubing
To remove, pull up horseshoe, push in collet
and pull tubing

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Vro-4Vro-5Vro-5wp

Table des Matières