Cembre PNB-1 Notice D'utilisation Et Entretien page 6

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ENGLISH
5. DIES
(Ref. to Fig. 2)
The dies available for this press have either front cable entry or side cable entry.
– dies with front cable entry (Fig. 2a) type: KE 2.5-1 ; KE 10-1.
– dies with side cable entry (Fig. 2b) type: ME...-50 ; PR-1 ; PB-1 ; PG-1 ; MN...RF- 50 ; MTT...-50.
a)
6. OPERATION
For a complete operation cycle (i.e. compression and release) press and release the manual control
(26); it is not necessary to hold down the pedal. The pedal must to be released in order to execute
another cycle.
The duration of the cycle is factory set at two seconds.
6.1) Connectors requiring side cable entry
Set the location of the positioner (08) to suit each size and type of connector (see Fig. 3):
– Insert the conductor into the connector and locate between the dies at the desired crimp position.
Adjust the stop on the positioner (08) to suit the particular size and type of connector (see Fig.
9). The connector should just touch the stop.
At this position, tighten the knurled nut to secure the positioner.
08
FIG. 2 DIES:
b)
a) front cable entry
b) side cable entry
FIG. 3 POSITIONER
ADJUSTMENT
6

Publicité

Table des Matières
loading

Table des Matières