Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
Installing/ Replacing the lamp
Only install the lamp with the device switched off! Unplug from mains before!
The lamp has to be replaced when it is damaged or deformed due to the heat!
Before replacing the lamp, unplug mains lead and let the lamp cool down (approx.5 minutes)
During the installation do not touch the glass-bulbs bare-handle! Pleae follow the lamp manufacturer's
notes!
Do not install lamps with a higher wattage! Lamps with a higher wattage generate temperatures the
device was not designed for. Damages caused by non-observance are not subject to warranty.
During the operation, the lamp reaches temperatures of up to 800°C.
For the installation, you need a 240V/650W GY-9.5 lamp.
Procedure:
Step 1: Unscrew the fixation screws of the service lid on the bottom of the housing.
Step 2: Open the service lid
Step 3: If replacing the lamp, remove the old lamp from the socket
Step 4: Insert the new 240V/650W GY9.5 lamp into the lamp-socket.
Step 2: Close the service lid and tighten the screws.
Overhead rigging
Please consider the EN 60598-2-17 and the respective national norms during the
installation! The installation must only be carried out by an authorized dealer!
The installation of the projector has to be built and constructed in a way that it can hold 10 times the
weight for 1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch
net. This secondary safety attachment must be constructed in a way that no part of the installation can
fall down if the main attachment fails.

DANGER TO LIFE!

Do not operate this device with opened service lid!
DANGER TO LIFE!
CAUTION!

Publicité

Table des Matières
loading

Produits Connexes pour SX Lighting PL ZOOM

Table des Matières