Pre-Install Checklist - Bosch SHSM4AZ55N Notice D'installation

Masquer les pouces Voir aussi pour SHSM4AZ55N:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

IMPORTANT!
Before you begin, you must read the safety instructions.

PRE-INSTALL CHECKLIST

1. Unpack unit. Retain packing material until successful installation is
complete.
2. Remove all packing material from inside the dishwasher.
3. Inspect parts to ensure you have all the necessary materials.
4. Flush household hot water supply for at least two minutes.
5. Measure the enclosure area. Is the opening at least 34" (863.6 mm)
high and 24" (609.6 mm) wide?
6. Is the opening near enough to the sink for the water line and drain
hoses to access plumbing?
7. Will the unit be installed close enough to the sink so that drain hose
length does not exceed 92" (2336.8 mm) and so that a portion of the
drain hose is raised at least 33" (840 mm) above the floor?
8. Do the openings for electric cable, water line, and drain hose routing
through cabinet fit within the shaded area in Figure 3?
9. Are the openings sanded smooth if wood or covered by a protective
gasket if metal?
10. Is your water heater set at 120°F (49°C) and does water pressure
measure 15-145 psi (1-10 bar)?
11. If installing in a corner, will the dishwasher door clear cabinet hardware?
12. Determine mounting method based on dishwasher model and counter-
top type (see Figures 11-14).
13. Only use included hardware for install. If replacing dishwasher, dispose
of old hose and other equipment properly.
9

Publicité

Table des Matières
loading

Table des Matières