Whirlpool 10 Button - User Manual
EN
1.5.2
Inspection hatch(es).
To enable maintenance the tub panel or wall must be fitted with a splash-proof hatch with a size of at least 40x50cm.
Such an opening must be
wide for access to the
electronics
position of the holes. The Riho maintenance service cannot service the motors if there are no inspection hatches or if the
hatches are too small. For the best accessibility to the system Riho advices you use cover front panels (if available for the
bath type).
1.5.3
Panels
Where panels are used, do not seal them. They must be removable. Cover panels must be installed in such a way that the
space under the bathtub meets ZONE 3 criteria, see Chapter 1.1, ie. so that the space under the bathtub is not accessible
without using the tool!
1.5.4
Hot and cold water supply.
The supply pipelines may be installed on the rim of the bath or on the wall for connection to the bath tap. A drainage
overflow installation with water supply can also be supplied. Ask your dealer for Riho overflow-drain combinations with
water supply in the bath.
Maximum allowable water temperature is 60°C
In case of installation of a drainage overflow installation with water supply in the bath, an aerator water supply should be
installed in the supply line. This is to prevent dirty water from flowing back into the supply pipeline.
1.5.5
Water drain
Connect the drain pipeline with siphon to the bathroom drain pipeline (min 40 mm). The bathroom drain pipeline must be
positioned at around 25-35 cm from the center line of the bath's drain, and should have sufficient drainage so that adequate
drainage is ensured (see fig. 6).
max. 60°C
position
ed close to each engine and heater. In front of the openings, a space of at least 50 cm
must be freely accessible.
system Hydro/Aero
Figure 5 Inspection hatch(es)
See figure 5.
See the RIHO Technical Catalog for the exact
Fig. 6: Waste instalation
-7-
system Hydro
or Aero