Complete Assembly - Gladiator W10893670A Instructions D'assemblage

Largeur de rayonnage de 77", 60" et 48"
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Support Beam Orientation
End Frames/Support Beams
P2—Support beams (8)
P4—Welded end frames (2)
Assemble Tie Channel Supports
This shelving unit is equipped with 1, 2, or 3 tie channel supports (P3)
for each shelf.
NOTES:
The tie channel supports (P3) provide load support and structural
integrity.
All tie channel supports (P3) must be assembled as shown in "Tie
Channel Support Assembly" illustration.
1. Rotate the tie channel support (P3) into the front and back
support beam (P2), aligning the tie channel rivet heads with the
matching large diameter hole of the support beam keyhole.
2. To insert the rivet head on the other side of the tie channel
support (P3), apply pressure to both sides of the tie channel
support (P3), squeezing the sides toward each other. Insert the
rivet head into the matching larger hole of the support beam
keyhole on the front and back support beam (P2). Release
pressure.
Tie Channel Rotated into Front and Back Support Beam
Rivet Inserted into Keyhole
3. Check that the rivets are held behind the smaller hole of the
support beam keyholes.
4. Repeat steps 1 and 2 for each tie channel support.
Tie Channel Support Assembly
A. P3—Tie channel support
B. Rivet head

Complete Assembly

1. Verify that all beams and tie channel supports are properly
assembled and tightened.
2. Place wire shelf (P1) on top of the tie channel supports (P3) for
each shelf.
3. Move shelving unit to final location.
C. Support beam lower
flange with keyhole
5

Publicité

Table des Matières
loading

Table des Matières