Transport And Storage; Receipt And Control Of Deliveries; Unpacking And Control Of Goods; Commissioning - hawa 2676-0201-00-00 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4 Transport and storage

Please provide the following environmental conditions during transport and storage:
dry
frost-free
dust-protected
corrosion-protected

4.1 Receipt and control of deliveries

The goods are delivered on an Euro pallet.
Please check the packaging after receipt of goods for:
transport damages
other conspicuous features
Any damage found must be documented immediately (damages should be confirmed in writing by the carrier!)

5 Unpacking and control of goods

Dispose the packaging material environmentally friendly or re-use it!
Check the goods for damages
Any damage found has to be documented and reported to your local sales office (see last page)
Check the goods upon receipt for completeness
Fig. 1
Fig. 1
Cable duct cutter with hydraulic cylinder and quick release coupling
Insertion guide with clamping device
Length stop 1 m
Hook
Wedges - left + right
Operating instructions
Declaration of conformity / Declaration of incorporation

6 Commissioning

Follow all operating instructions in order to minimize the risk of bodily injuries und tool damages.

6.1 Assembly

Bolt the cable duct cutter (1) on a solid and stable base with 4 screws. Depending on the material of the base use M12 or M10 allen screws or 6 mm
wood screws with washers.
Please pay attention to the following:
Correct height for fatique-free working.
Mounting of the length stop for cutting:
.
Fix the stop (5) with 2 screws
Abb. 1
3
4
1
7
2
8
5
6
7
(it. 1 + 2)
(it. 3+4)
(it. 5)
(it. 6)
(it. 7)
2676-0000-01-77
9

Publicité

Table des Matières
loading

Table des Matières