Télécharger Imprimer la page

HBM PW29P Serie Notice De Montage page 10

Publicité

10
Spacing disc
Set the overload stop during
installation and fix in
position with a screw locking adhesive
Fig. 3.1:
Load application and installation
Important
Load must not be applied to the side where the cable connection is located,
as this would cause a force shunt.
Setting the overload stop:
Type PW29P load cells are fitted with an adjustable overload stop. Set this
overload stop before starting up the load cell.
To do this, load the installed load cell with approx. 120% of the service load, at
the maximum eccentricity for the particular application. The maximum
permissible loadings stated in the specifications must not be exceeded. Note
in particular the "Limit load at max. 100 mm eccentricity" specification, and
take into consideration the moment produced by the eccentricity in your
individual application. Then adjust the screw of the overload stop and fix it in
position with a screw locking adhesive, such as Loctite.
HBM
Direction of loading center of platform
=
Load application
=
=
=
Spacing disc
PW29P
Connector plug
Mounting
A3578-1.0 en/de/fr

Publicité

loading

Ce manuel est également adapté pour:

Pw29p0