This fine pump that you have just purchased is designed from the latest in
material and workmanship. Before installation and operation, we recommend
the following procedures :
Check with your local electrical and plumbing codes to ensure you comply with the
A
regulations. These codes have been designed with your safety in mind. Be sure you
comply with them.
We recommend that the pump be used on a separate circuit lead from the home
B
electrical distribution panel, and which is protected with a fuse or a circuit breaker.
We also recommend that a ground fault circuit be used. Consult a licensed
electrician for all wiring.
The ground terminal on the three prong plugs should never be removed. They are
C
supplied and designed for your protection.
Never make adjustments to any electrical appliance or product with the power
D
connected. Do not only unscrew the fuse or trip the breaker, remove the power plug
from the receptacle.
MONTHLY MANDATORY CHECK-UP :
1. Inspect the pump for any obvious condition that necessitates cleaning, correction, adjustment
or repair.
2. Clear the sump and the surroundings of any paper, leaves or other debris that might clog the
input openings. Remove anything that might float into the suction area.
3. Ensure that the pump is secure and vertical for proper operation.
4. Ensure that there is adequate clearance from any combustible materials or structure. Stored
materials must be kept away from the pump. Shelves or cabinet structures must not be in close
proximity to the pump.
5. Test the 'GFCI' outlet by pressing its test switch. This should prove that the outlet is energized
and will trip off to protect against a ground fault. Be sure to reset the 'GFCI' by pressing its
reset switch.
6. Lift the float to prove that the pump will start when required. (Step 8 below will test submersible
pumps with enclosed floats).
7. Put the necessary pail of water in the sump to prove that any check valve present will permit
effluent to flow.
8. Observe that the plumbing can carry the effluent safety out the residence.
MATERIAL REQUIRED FOR A SUBMERSIBLE SUMP PUMP APPLICATION
Desired lenght of 1 1/2'' or 1 1/4'' of ABS/DWV pipe to link up the pump to the drain line.
1 only 1 1/4'' check valve (350353) (Note that this 1 1/4'' check valve may also be use with a 1 1/2'' pipe).
Sump pit or 1 only sump basin.
1 1/4'' - 1 1/2'' stainless steel clamps (750886).
ABS cement.
Tools
Screwdrivers, hacksaw to cut pipe, knife to assist in pipe cutting, round file to smooth pipe ends, pipe wrench,
adjustable wrench to tighten fittings.
2
SAFETY INSTRUCTIONS
NOTICE
This unit is not designed for applications
involving salt water or brine. Use with salt water
or brine will void warranty.