Télécharger Imprimer la page

MetalTech BuildMan I-BMDPL Mode D'emploi page 2

Publicité

TOOLS NEEDED:
• C-Clip plier
• Long nose plier
• 10 mm, 17mm, 19 mm,
wrench or socket and ratchet
• 3 mm, allen key
PRELIMINARY INSTRUCTIONS BEFORE BEGINNING
CHAINS REPLACEMENT
1. Remove drywall support
2. Crank the I-BMDPL until each mast comes 3 inches out of the previous mast
3. Unbolt the two M10 nuts of the cover
4. Remove the rolling base so that you end up with the mast assembly only
5. Lay the I-BMDPL on a long table or on the ground
6. Unbolt the M19 nut to remove the crank assembly and the 22 tooth sprocket
7. If chain #1, #2 or #4 must be replaced as well, follow the steps on page 3
*it is possible to remove the crank assembly and the 22 tooth sprocket without having to detach the #5 chain. To do so, it is necessary to pull
the crank assembly and the sprocket simultaneously. Be carefull not to lose de sprocket key
GYPSUM SUPPORT
1
2
2
All manuals and user guides at all-guides.com
COVER
3
M10 NUT
ROLLING BASE
4
5
6
THIRD MAT
SECOND MAST
FIRST MAT
BASE
CRANK
ASSEMBLY
CHAIN #5
GEAR
M19 NUT

Publicité

loading