Télécharger Imprimer la page

Zephyr Siena Pro Island ZSL-E36DS Guide D'utilisation, D'entretien Et D'installation page 15

Publicité

ZEPHYRONLINE.COM
Mounting the Hood
3. Lift support frame assembly up to the ceiling
making sure the word "front" on the top support
frame faces the front of the hood where the
controls will be located. (FIG. C) The key holes
on the top support frame should cover the wood
screws previously installed in the ceiling. Slide
support frame towards narrow end of key holes to
lock the frame in place. Install the last (2) M6 x 1"
wood screws with washers into the two remaining
corners of the top support frame to secure it to the
ceiling. Tighten all screws.
4. Lift hood and align the (4) pre-installed mounting
screws located on top of the unit body (FIG. A4)
with the (4) key holes on the Bottom of Support
Frame. (FIG. D). Slide hood towards the narrow end
of key holes to lock into place. Hand tighten each
of the (4) screws with a screwdriver to secure hood
to Bottom Support Frame. Further secure bottom
support frame to unit body by one M4 x 12 safety
screw. (FIG. E).
5. Attach junction box to lower support frame lateral
bracket by (2) M4 x 8mm screws. (FIG. F). Secure
junction box wire from hood to junction box to
support frame arm by (2) zip ties.
Siena Pro Island Use, Care, and Installation Guide
Installation Instructions
Bottom Support Frame
(secures to top of blower housing)
front - facing controls
back
Key Holes
FIG. D
FIG. E
FIG. F
15

Publicité

loading

Ce manuel est également adapté pour:

Siena pro island zsl-e42dsSiena pro island zsl-e48ds