Télécharger Imprimer la page

Tecno-gaz DISTILLER 250-S Mode D'emploi page 19

Publicité

PAR 05
INSTALLATION OF ACTIVATED COAL
FILTER
Turn thhe cap (A) and remove it from the filter-
holder container (B).
Fold the active coal filter (C- ref. SDIA042) and
put it into the proper container (B)
Reassemble the container with the cap and
place on the collection water tank.
Ad just the tank with the filter with the draining of
the distiller.
A filter can be used for about a
month
FILLING OF CHAMBER
Remove the connection from the upper cover (N)
and lift the upper cover (G).
Fill the stainless steel making sure that it doesn't
exceed the level (see internal mark) with cold
water or hot water if you want to reduce the time
necessary to obtain distilled water.
OPERATING
Verify that the upper cover is closed (G) and place
the distiller on a flat surface, solid and safe, line up
the tank with the draining of the distiller (D), putting
the filter-holder container between them as shown (E)
Connect the electrical feeling cable to the electric
network (M) and the connection of the upper cover
for the feeding of the engine (N).
The process is completely automatic, at the end of
the distillation, water is finished, the machine
switches off automatically.
In order to stop the machine before the distillation of
all the water it is necessary to disconnect the electric
feeling. After about 1 hour of working the process
starts and after about 7 hours you'll have 4 liters of
distilled water. The water obtained can be kept in a
container preferably in refrigerator. Before consuming
you'd better shake the container.
AT THE BEGINNING THE MACHINE IS READY TO
DISTILL, THEN EVERY TIME YOU WANT DO
START A PROCESS OF DISTILLATION IT IS
NECESSARY TO REARM THE MACHINE
PRESSING THE PROBER BUTTON ( R)
DDIFF051_REV1.doc
All manuals and user guides at all-guides.com
INSTRUCTIONS FOR USER
16 - 29
FIG 1
FIG 2
FIG 2

Publicité

loading