Télécharger Imprimer la page

LevelOne UPS-21 Serie Mode D'emploi page 5

Publicité

Special precaution
• The unit is heavy: wear safety shoes and use vacuum li er preferentially for handling
operations
• All handling operations will require at least two people (unpacking, lifti g, installation in
rack system).
• Before and a er the installation, if the UPS remains de-energized for a long period, the
UPS must be energized for a period of 24 hours, at least once every 6 months (for a nor-
mal storage temperature less than 25°C). This charges the ba ery, thus avoiding possible
irreversible damage.
• During the replacement of the Ba ery Module, it is imperati e to use the same type and
number of elements as the original Ba ery Module provided with the UPS to maintain
an identi al level of performance and safety.

Publicité

loading

Ce manuel est également adapté pour:

Ups-2101 1kvaUps-2102 2kvaUps-2103 3kvaEbm-2136Ebm-2172