Preparation; Operation Instructions - Smartpond 52269 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PREPARATION

Before beginning assembly or operation of product, make sure all
parts are present. Compare parts with package contents list and
diagram. If any part is missing or damaged, do not attempt to
assemble, install or operate the product. Contact Customer Care
for replacement parts.
Estimated assembly time: 5 minutes.
No tools required for assembly.

OPERATION INSTRUCTIONS

This kit includes a coupler and a diverter valve. To flow water only
to the fountain nozzle only, proceed to step 1. To flow water to the
fountain nozzle and a spitter, skip to step 2.
PLEASE CALL CUSTOMER CARE BEFORE RETURNING ITEM TO LOWE'S: 1-888-755-4497
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

52531

Table des Matières