Daikin Siesta Sky Air ACQ 71 DV1 Manuel D'installation page 9

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
Wires Installation
Figure 1 and Figure 2 shows the location of cover wire in Indoor unit.
Steps to install power supply wires and wires from outdoor unit.
1.
Remove wire cover by removing 2 screws as shown in Figure 3.
2.
Wires will go through the hole as shown in Figure 4 and 5 respectively without crossing the height of the hole.
3.
After that, wire cover will be assembled back to close the wire.
Figure 2
Figure 4
Do not install the unit at altitude over 2000m for both indoor and outdoor.
Figure 1
! CAUTION
1-7
Figure 3
Power supply
terminal block
Shape wires so
that the stop valve
cover fit securely.
1-3
B
A
A<B
Figure 5

Publicité

Table des Matières
loading

Table des Matières