Télécharger Imprimer la page

Volkswagen GYS VAS 821 101 A Manuel D'instruction page 55

Publicité

Raison sociale :
JBDC
Adresse :
ZI, 134 Bd des Loges
Code postal :
53941
Ville :
Saint-Berthevin
Intervenant :
OPERATEUR
Ordre de réparation :
977AC92
Date du journal :
05/04/2018
Intervention :
AILE ARRIERE
Commentaires :
Commentaires
GYSPOT BP.LG (1712009013)
Id
Date
Mode
1
05/04/18 10:22
Auto
Pince en C n°1
2
05/04/18 10:22
Auto
Pince en C n°1
3
05/04/18 10:22
Auto
Pince en C n°1
4
05/04/18 10:22
Auto
Pince en C n°1
5
05/04/18 10:22
Auto
Pince en C n°1
6
05/04/18 10:23
Normal
Pince en C n°1
7
05/04/18 10:23
Normal
Pince en C n°1
8
05/04/18 10:23
Normal
Pince en C n°1
9
05/04/18 10:23
Normal
Pince en C n°1
10
05/04/18 10:23
Normal
Pince en C n°1
11
05/04/18 10:23
Manuel
Pince en C n°1
SAFETY AND MAINTENANCE
User training
People operating this machine must receive suitable training in order to get the most out of the machine capabilities and carry out good quality repairs
(examples: car body work training).
Preparation of the parts to be assembled
It is essential to clean and accost the area to be welded.
In the case of a protective application, make sure that it is conductive by first testing a sample.
Using the underwing arm
The maximum pressure is 100 daN.
O-rings for the locking nuts of G arm.
Inside the 2 arm locking nuts, there are 2 O-rings that must be replaced in case of a leak or every 6 months. These 2 seals are necessary to avoid
any risk of leakage.
These seals are O-rings d=25, group of 4. When replacing these seals, grease must be applied to them. (ref. 050440 : contact grease)
Quantity and quality of the coolant
The coolant level is important for the correct operation of the machine. It must always be between the minimum and maximum level indicated on the
trolley. Top up with demineralized water if necessary.
Replace the coolant every 2 years :
1
Switch off the power supply using the switch located at the rear of the machine (OFF position) and disconnect the unit from the mains.
2
Place a bucket (min. 30 l capacity) under the machine drain hole.
3
4
Rinse the inside of the tank with running water to remove deposits.
5
Replace the drain plug. (
6
Fill the tank with coolant (5l : 062511 / 10l : 052246)
7
Turn the power back on (ON position) and check for leaks.
VAS 821 101 A
Téléphone :
Télécopie :
Email :
Site Web :
Marque :
Modèle :
N° châssis :
Immatriculation :
Mise en circulation :
Consignes
Outil
Temps
Serrage
Intensité (kA)
Intensité (kA)
(ms)
(daN)
630
9,4
325
9,4
630
9,4
325
9,3
490
8,2
240
8,2
510
8,3
250
8,2
510
8,3
250
8,3
350
7,3
225
7,3
350
7,3
225
7,2
400
8,1
265
8,0
400
8,1
265
8,1
400
8,1
265
8,1
400
8,1
510
8,1
A
1 0 1
2 1
S 8
| V A
A G
V W
:
4 N.m)
0243510101
0243510102
contact@companyname.com
www.companyname.com
PEUGEOT
308SW
12365849
1450UT53
01/01/2017
Mesures
Etat
Serrage
Epaisseur
(daN)
(mm)
325
3,5
Point Ok
325
3,5
Point Ok
240
2,0
Point Ok
245
2,1
Point Ok
245
2,1
Point Ok
225
-
Point Ok
-
225
Point Ok
-
265
Point Ok
-
260
Point Ok
-
270
Point Ok
-
440
Pression faible
Unscrew the drain plug located under the
machine using a 10 mm torx spanner.
(Ref. S6262)
EN
55

Publicité

loading