SHOWER SYSTEM
Step 1: Clean the water pipe and install the curved connector
cold
hot
Figure 1
a) Run the water around 1-2 minutes to clean
the water pipe.
b) Make sure the 2 curved connectors 12 are
installed deadly straight into the wall. The
centre distance between 2 curved connectors
is 150±10mm and the centre line remains
horizontal (Figure 1).
Step 2: Install the thermostatic shower bar
a) Insert the filter rubber washer 11 inside the inlet of the thermostatic shower bar 9 (Figure 4). Connect the
thermostatic shower bar onto the curved connectors (Figure 5). Left side is hot water and right side is cold water.
Step 3: Assemble the pipe for the
shower head
a) Insert the slider 7 over the riser rail 5 (Figure 6).
b) Unlock the catch on the pipe connector 4 and
connect the arm pipe 2 to the riser rail and
tighten up (Figure 7).
c) Connect the raiser rail to the thermostatic shower
bar and mark the position of the pipe connector
on the wall (Figure 8).
Teflon tape
c) Wrap the teflon tape anticlockwise on the
thread of the G1/2 end, connect them to the
hot and cold water outlets by a wrench. Leave
suitable depth out of the wall and adjust the
distance between 2 connectors according to the
width of the inlet on the thermostatic shower
bar (Figure 2).
11
Figure 4
Figure 6
4
12
Figure 2
Figure 5
2
4
7
5
Figure 7
Figure 3
d) Screw the decorative covers 10 on
the wall (Figure 3).
14
Figure 8
EN