INSTALLATION FOR VENTILATION SYSTEM
1
Determine the supply air stream duct, into which the fragrance is to be introduced.
We do not recommend feeding directly into the monoblock, but into the supply air duct.
2
Determine the mounting position of the insertion nozzle. (AERO-S: 2 insertion nozzles).
If possible, select position at least 1 running metre of duct after monoblock.
3
Determine the mounting position of the unit.
Unit should be mounted below the air duct/insertion nozzle, as close as possible.
4
Check the course of the tube.
When connecting the unit to the insertion nozzle, there must be no kinks or dents in the course of
the tube. The tube should be laid in an ascending direction. The optimum tube length is less than
2 metres.
5
Fit the nozzle. (see fig.) (AERO-S: 2 insertion nozzles).
Drill a hole in the supply air duct with a percussion drill (Ø 16 mm). Insert the nozzle.
Important: Align the bevel of the nozzle away from the air flow!
Fix the mounting plate to the duct with metal screws (predrill holes if necessary).
6
Connect the hose to the insertion nozzle and guide it to the planned unit position.
Check: When connecting the unit to the insertion nozzle, there must be no kink or dent in the
course of the hose.
7
Fix the mounting rail to the wall with dowels and screws. (see fig.)
8
Hang the unit on the mounting rail.
9
Shorten the tube to a suitable length and connect it.
10
Plug in the power cable of the unit.
Your unit is now ready for operation.
STEP 5
FIT NOZZLE
Ø 16 MM
24
STEP 7
FIX MOUNTING RAIL
TUBE
Ø 12 MM
2 M
C OR RECT
WRO NG
Insertion nozzle averted from the
air flow
Tube ascending without kink
and without dent
wrong!
Insertion nozzle facing the air
stream
wrong!
Kink in the tube
wrong!
Tube drops
wrong!
Dent in the tube
25