Télécharger Imprimer la page

Publicité

Liens rapides

Monitoring Box
IMA-BOX
Monitoring Box
IMA-BOX
FR
FR
EN
Version externe / External version
1
Installation_Manual_Monitoring_Box_
_VA.6
IMA-BOX

Publicité

loading

Sommaire des Matières pour IMEON ENERGY IMA-BOX

  • Page 1 Monitoring Box IMA-BOX Monitoring Box IMA-BOX Version externe / External version Installation_Manual_Monitoring_Box_ _VA.6 IMA-BOX...
  • Page 2 Monitoring Box IMA-BOX Suivi Indice des modifications / Modification Index Indice / Pages modifiées / Description de la modification / Auteur / Date Index Modified pages Modification description Author 08/12/16 Rédaction initiale / Initial Drafting 12/12/16 Navigation -> firmware 1.5...
  • Page 3 Monitoring Box IMA-BOX Monitoring Box : installation Installation_Manual_Monitoring_Box_ _VA.6 IMA-BOX...
  • Page 4 Monitoring Box IMA-BOX SOMMAIRE 1. Modes de fonctionnement ........................5 2. Connectique ............................5 3. Accessoires ............................6 4. Schéma général d’installation ......................7 5. Smart Meter ............................8 6. Commande du groupe électrogène (Relay) ..................10 7. Configuration de l’onduleur : MANAGER WEB .................. 11 7.1 Connexion ..........................
  • Page 5 Monitoring Box IMA-BOX Avant de procéder à l’installation du matériel, lire attentivement cette notice. Une mauvaise utilisation des équipements peut générer des dommages matériels et/ou corporels irréversibles. 1. Modes de fonctionnement Véritable PC embarqué, la Monitoring Box est dotée d’un ensemble de logiciels de supervision des installations électriques.
  • Page 6 Monitoring Box IMA-BOX Gigabit RS485 Mini USB Ethernet Capteur de courant* Relay Charge externe* Jack USB-A WiFi RS485 * Disponible prochainement Capteur de température* 3. Accessoires La Monitoring Box est fournie avec les accessoires suivants : Accessoires Photo Alimentation 12V Câble de...
  • Page 7 Monitoring Box IMA-BOX 4. Schéma général d’installation Ce schéma décrit une installation standard avec une Monitoring Box externe. ATTENTION : Le câble USB/RS232 reliant l’IMA-BOX à l’onduleur doit être branché sur le port USB du bas côté IMA-BOX. Installation_Manual_Monitoring_Box_ _VA.6...
  • Page 8 Monitoring Box IMA-BOX 5. Smart Meter 1. Le compteur doit impérativement être installé en amont de l’onduleur (coté réseau public). Le compteur mono est un compteur avec pince ampèremétrique. Voir schéma ci-dessous : 2. Le câble de communication du compteur doit être branché sur le port RS485A de l’onduleur.
  • Page 9 Monitoring Box IMA-BOX Navigation sur le Smart Meter : Smart Meter Monophasé Chaque pression successive sur le bouton affiche successivement : 1. Energie active totale en kWh 7. Fréquence en Hz 2. Energie active consommée en kWh 8. Facteur de puissance 3.
  • Page 10 Monitoring Box IMA-BOX 6. Commande du groupe électrogène (Relay) Le branchement ci-dessus permet de piloter le démarrage ou l’arrêt automatique d’un GE (Groupe Electrogène) en fonction de la tension du parc de batteries via un contact sec. Le groupe électogène doit être équipé d’un régulateur de tension et d’un ATTENTION régulateur de féquence.
  • Page 11 Monitoring Box IMA-BOX 7. Configuration de l’onduleur : MANAGER WEB MANAGER WEB est une application WEB incluse dans l’IMEON. Elle permet, sur un réseau Wi-Fi local, un paramétrage simple et rapide des fonctionnalités de l’IMEON ainsi qu’une visualisation en temps réel de l’ensemble du système. Elle permet également la configuration de l’onduleur pour le connecter à...
  • Page 12 Monitoring Box IMA-BOX 7.2 Identification Selon le profil de connexion, s’identifier avec les informations ci-dessous : Profil Utilisateur : Usage : Permet un accès à une interface simplifiée Email : user@local Mot de passe : password Profil Installateur : Usage : Permet un accès à une interface avec des paramètres supplémentaires...
  • Page 13 Monitoring Box IMA-BOX 7.3.2 Page « Manager » : Onglet flow (Gestion des flux) L’onglet « Flow » permet de modifier le fonctionnement général de l’onduleur. Se référer à l’annexe « Modes de fonctionnement » pour connaître les différents modes.
  • Page 14 Monitoring Box IMA-BOX 3. Le message « Starting battery manager » apparaît. 4. Démarrer physiquement la batterie. L’interface indique « Detecting battery in progress ». 5. Dès que le message « Battery ready to start» s’affiche, appuyer sur le bouton « ON » de l’interface WEB.
  • Page 15 Monitoring Box IMA-BOX 7.3.5 Menu déroulant "User /Installer" En cliquant sur le menu déroulant, un sous menu s'ouvre, contenant « Wi-Fi », « about » « Log out ». 7.3.5.1 Sous-menu Wi-Fi Permet de connecter l’onduleur à internet. Se référer à la section « Accès Internet via Monitoring »...
  • Page 16 Monitoring Box IMA-BOX 8. Connecter l’onduleur à internet : MONITORING Le MONITORING est une application WEB permettant de visualiser à distance les données de l’installation en temps réel et de consulter l’historique des données. Cette application nécessaire une connexion illimitée à Internet dont l’abonnement est à la charge de l’utilisateur.
  • Page 17 Monitoring Box IMA-BOX 8.2 Configuration pour une connexion par Wi-Fi 1- Se connecter à MANAGER WEB, puis se rendre dans le menu déroulant User/Instaler WiFi. 2- Appuyer sur « List connection » pour scanner la liste des réseaux Wi-Fi disponibles par l’onduleur.
  • Page 18 Monitoring Box IMA-BOX 8.4 Description du MONITORING 8.4.1 Accueil La page accueil est la même que pour MANAGER WEB. Elle permet de visualiser en temps réel la répartition des sources alimentant la consommation ainsi que l’évolution du taux d’autoproduction, du parc batteries et des différents flux d’énergie...
  • Page 19 Monitoring Box IMA-BOX 8.4.4 Réseau Permet de visualiser en temps réel et sous forme d'historique (journalier, mensuel et annuel) la puissance réseau consommée et injectée. Permet également de visualiser les variations de tension et de fréquence du réseau public au cours des dernières minutes.
  • Page 20 Monitoring Box IMA-BOX 9. Codes warning et erreurs n cas de présence d’un warning ou d’une erreur sur l’onduleur, se référer au tableau ci-dessous avant de contacter le support technique si nécessaire. warning_ond Le réseau électrique a des perturbations. warning_ond Le réseau électrique a des perturbations.
  • Page 21 Monitoring Box IMA-BOX error_ond Erreur du capteur de courant DC error_ond Surtension entrée PV error_ond Courant de fuite excessif. error_ond Onduleur DC en surintensité à cause de la fluctuation réseau. error_ond Erreur de mesures du réseau sur le processeur 1.
  • Page 22 Monitoring Box IMA-BOX error_spe La tension sur la sortie AC est au-dessus de la spécification maximale. error_spe Puissance sur la sortie AC au-dessus de la spécification maximale. error_spe La tension sur le Bus DC est au-dessus de la spécification maximale.
  • Page 23 Monitoring Box IMA-BOX Monitoring Box / Installation Installation_Manual_Monitoring_Box_ _VA.6 IMA-BOX...
  • Page 24 Monitoring Box IMA-BOX Contents 1. Running mode ........................... 25 2. Connectors ............................25 3. Accessories ............................26 4. Installation overview ......................... 27 5. Smart Meter ............................28 6. Generator relay ..........................30 7. Inverter configuration : MANAGER WEB ................... 31 7.1 Network Connection .........................
  • Page 25 Monitoring Box IMA-BOX Before installing this material, read carefully this document. A bad usage of this equipment can lead to non reversible body damage and/or equipment failures. 1. Running mode Behaving as a true embedded computer, the Monitoring Box runs an eletrical installations management feature.
  • Page 26 Monitoring Box IMA-BOX 3. Accessories The Monitoring Box is provided with the following accessories: Accessories Name Photo Power supply 12V Communication cable USB-RS232 Communication cable: Monitoring Box (USB) to inverter (RS232) WiFi antenna Relay Connector Installation_Manual_Monitoring_Box_ _VA.6 IMA-BOX...
  • Page 27 Monitoring Box IMA-BOX 4. Installation overview Monitoring Box This scheme describes a standard installation with an external Warning : The USB/RS232 cable between IMA-BOX and inverter must be plugged into the bottom USB port of the IMA-BOX. Installation_Manual_Monitoring_Box_ _VA.6 IMA-BOX...
  • Page 28 Monitoring Box IMA-BOX 5. Smart Meter 1. The energy meter must be installed between the IMEON inverter and the Public Grid. The monophase Smart meter model is equipped with a clamp. See the diagram below: 2. The communication cable has to be plugged on the RS485A inverter port.
  • Page 29 Monitoring Box IMA-BOX Navigation for single phase Smart Meter: Each successive pressing of the button selects a new range: 1. Total active energy in kWh 7. Frequency in Hz 2. Consumed active energy in kWh 8. Power factor 3. Injected active energy in kWh 9.
  • Page 30 Monitoring Box IMA-BOX 6. Generator relay The integrated relay allows automatically starting and stopping the diesel generator via a dry contact depending on the battery state of charge. WARNING: The generator must be equipped with a voltage regulator and a frequency regulator.
  • Page 31 Monitoring Box IMA-BOX 7. Inverter configuration : MANAGER WEB MANAGER WEB is web-based software included with IMEON inverters, which allows using local Wi-Fi network for easy and intuitive configuration of the system and real-time monitoring. It also allows setting up the Internet access for the inverter.
  • Page 32 Only the IMEON MANAGER WEB software can be used for configuration of IMEON inverters. The use of any software other than IMEON MANAGER WEB is not authorized by IMEON ENERGY and may cause irreversible damage affecting the operation of IMEON inverter.
  • Page 33 Monitoring Box IMA-BOX 7.3.2 « Manager » page : FLOW The "Flow Management" tab allows you to change the mode of operation of the inverter. Refer to the annex “Mode of operation” for more information on different modes of operation.
  • Page 34 Monitoring Box IMA-BOX 3. The message "Starting battery manager" will be displayed 4. Start the battery physically. The Battery Status indicates "Detecting battery in progress". 5. When the message "Battery ready to start" appears, move the Battery State switch to "ON" position on the WEB interface.
  • Page 35 Monitoring Box IMA-BOX 7.3.5 User/Installer drop-down menu By clicking on the drop-down menu, a submenu is opened including « Wi- Fi », « about » « Log out ». 7.3.5.1 Wi-Fi Allows connecting the inverter to Internet. Refer to “Inverter Internet access: MONITORING” Section.
  • Page 36 Monitoring Box IMA-BOX 8. Inverter Internet access : MONITORING The MONITORING is a Web-based application for remotely viewing the real time as well as historical photovoltaic plant performance data. This application requires an unlimited connection to the Internet, the subscription of which is the responsibility of the user.
  • Page 37 Monitoring Box IMA-BOX 8.1 Configuration for Ethernet connection 1. Connect the inverter with an Ethernet cable (RJ45) from “ETH” port to an access point. 2. Check if the DEL of « ETH » port are blinking 3. On a PC connected to the same Ethernet network, through the network explorer, check if an IMEON device is displayed.
  • Page 38 Monitoring Box IMA-BOX 8.3 Web portal Identification The URL to access the MONITORING portal is: monitoring.imeon-energy.com Log in with the information (email address and password) you received by email when the installer created the user account, then press "Login". If no account has been created, contact your installer.
  • Page 39 Monitoring Box IMA-BOX 8.4 Description of the MONITORING 8.4.1 Home page The homepage is the same as one of MANAGER WEB. It allows to view the real time distribution of the energy sources feeding the load, as well as the evolution of the self-production rate, the status of the battery and the overview of the energy flow.
  • Page 40 Monitoring Box IMA-BOX 8.4.4 Grid page Allows viewing the real time, daily, monthly, annual and historical data concerning power consumed from and injected to the public electrical grid as well as grid voltage and frequency. 8.4.5 Storage page Allows viewing the real time, evolution and historical data concerning the state of charge, battery voltage, charging current and discharging current.
  • Page 41 Monitoring Box IMA-BOX Warning and error codes Warning and error codes In case of a warning or error displayed by the inverter, refer to the table below before contacting technical support if needed. warning_ond The electrical grid has perturbations. warning_ond The electrical grid has perturbations.
  • Page 42 Monitoring Box IMA-BOX error_ond Internal relay failure. error_ond DC current sensor failure. error_ond PV input overvoltage. error_ond Over leakage current. error_ond Inverter DC overcurrent due to grid fluctuations. error_ond Grid measurement error on processor1. error_ond GFCI sensor failure. error_ond AC input ground loss.
  • Page 43 Monitoring Box IMA-BOX error_spe Voltage on AC Output exceeds minimum voltage specification. error_spe Voltage on AC Output overpasses maximum voltage specification. error_spe Power on AC Output overpasses maximum power specification. error_spe Voltage on DC bus overpasses maximum voltage specification. error_spe Voltage on Battery overpasses maximum voltage specification.
  • Page 44 Monitoring Box IMA-BOX IMEON ENERGY / FRANCE * Votre énergie, vos règles Adresse / Address : 10 rue Amiral Romain Desfossés 29200 BREST - FRANCE Tel : +33 1 84 17 51 15 www.imeon-energy.com Installation_Manual_Monitoring_Box_ _VA.6 IMA-BOX...