INSTALLATION
WALL DRILLING AND BRACKET FIXING
As a first step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at the center of the
area in which the hood is to be fitted.
A horizontal line A at 970 – 1070 mm above the cooker top.
A horizontal line B at a X mm above the horizontal line A.
A horizontal line C at a 243 mm below the horizontal line A .
Mark Points:
Mark a point (1) on the horizontal line A, 80 mm to the vertical reference line.
Repeat this operation on the other side and on the vertical reference line,
checking that the three marks are leveled.
Mark a point (2) on the horizontal line B, 60 mm to the vertical reference line.
Repeat this operation on the other side, checking that the two marks are on
the same horizontal line.
Mark a point (3) on the horizontal line C, 100 mm to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are
leveled.
Fix the brackets :
Drill holes at the marked points with a ɸ10 mm drill bit.
Insert the Wall Plugs 11 into the holes.
Fix the hood fixing bracket 20 with 3 screws 10 (5 x 50) at the horizontal line A.
Fix a Chimney fixing bracket 21 with 2 screws 10 (5 x 50) at the horizontal line B.
100
100
C
(3)
Vertical reference line
Opción Cubretubo
7
400X390 160-500
1
500X490 260-700
2
600X590 360-900
3
X
V.1