Télécharger Imprimer la page

Samsung NSY6 8 5 Serie Manuel D'installation page 27

Publicité

Les langues disponibles

Les langues disponibles

Step 14. Final installation checklist
You have just completed installing your range. Make sure all controls are in the off
position and the flow of ventilation air to the range is unobstructed. The following
is a checklist to confirm your range is safely installed and ready for operation.
Gas line has been properly connected to the range. The gas has been turned
on. All connections have been checked for leaks.
Range is plugged into the properly grounded electrical receptacle.
Approved anti-tip bracket is properly installed and engaged with the range.
Range is leveled and is firmly sitting on a solid, level floor.
Gas surface burners have been properly assembled.
All burners have been tested for proper operation.
DG68-01650A-01_IM_NSY6DG8550SRAA_EN+MES+CFR.indb 27
DG68-01650A-01_IM_NSY6DG8550SRAA_EN+MES+CFR.indb 27
To adjust flame low setting
Identify which burner is exhibiting too high or too low of simmer rate via manifold
panel graphics.
1.
Simmer Set
Screw
2.
Small
Screwdriver
3.
Valve Stem
WARNING
1.
Do not completely remove the valve set screw from the valve stem.
Do not loosen more than 3 turns of the valve set screw. The valve set screw is
an integral part of the gas valve assembly. Removing the valve set screw will
cause gas to leak.
2.
After adjusting the valve set screw, inspect the assembly for gas leaks.
Rotate a knob to Lo position and
remove the knob from the valve stem
while the flame is lit.
Carefully push the screw driver into
the stem of the valve, until it hits
the simmer set screw. Make sure the
screwdriver flathead is seated into the
set screw groove.
Rotate valve set screw clockwise to
decrease Lo setting flame output, or
rotate set screw counter clockwise to
increase Lo setting flame output.
English 27
2024-06-14 오후 1:15:27
2024-06-14 오후 1:15:27

Publicité

loading