Step 2: Turn on the inverter DC switch and check, check the PV voltage through the
path: Menu> System Status > PV1/ PV2. If the PV voltage is 0, turn off the DC
switch, pull out the PV connetors, and then measure the voltage of the positive
and negative PV port (in MPPT voltage range 110-950 V) or check whether the
positive and negative poles of PV cables are reversed.
Step 3:
Switch the BAT switch to the "ON" position. Press and hold the BAT button for 1-2
seconds (at the point, the SoC indicators will rapidly flash yellow lights and then
turn to flash green lights).
• The button is in OFF status by default.
• A system problem may be encountered while pressing the button frequently. The
user may need to wait at least 10 seconds and then try again.
158
NOTICE!