Télécharger Imprimer la page

Garland HARVEST 962 NRQG Manuel D'instructions page 43

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 60
To install, remove the screw and add the fender
bracket by matching the holes and resting the flat
against the leg. Replace the screw and tighten the nut.
Install the outer mudguards fixing them with the
screws provided.
3
3
2
2
1
1
6.2.3. ASSEMBLING THE MILLING CUTTERS
Warning! The cutting edge of the blade must be in
the direction of the rotation of the milling cutters.
3
3
2
2
1
1
1
Install the double blade helix inside the single helix
blades fixing them with the pins and clips provided.
On the outside, place the plant protection plates fixed
with the pins and the snap ring.
6.2.4. INSTALLATION OF THE SPUR
Attach the spur (1) by passing the bolt (3) through the
chassis of the machine (2) and fix it by means of the
pin (4). Place the deep RAM (5) through the spur (1)
and insert the pin (6) at the desired height, fixing it
with the pin (7).
7
6
5
6.2.5. TRANSPORTATION WHEEL ASSEMBLY
Place the machine horizontally with the weight on the
blades and the tilling unit.
43/180
English
1
3
2
4

Publicité

loading