Télécharger Imprimer la page

probst BSZ-H-2.0 Instructions D'emploi page 43

Publicité

Les langues disponibles

Les langues disponibles

Installation
4.2
Hydraulical connection
4.2.1
Installation on carrier/lifting equipment
The hydraulic installation is carried out according to the enclosed hydraulic circuit diagram.
The connection to the carrier/lifting equipment may be accomplished only by qualified personnel.
Connection the device to the energy supply system be sure that the environment is free of dirt and that
the connecting hoses are free of abrasion and don not stuck in outstanding parts, while moving.
56400003
Open
gripper
Connection 12L
15 / 21
Close
gripper
GB

Publicité

loading