Télécharger Imprimer la page

Urban Barn Ewan Instructions De Montage page 6

Publicité

Les langues disponibles

Les langues disponibles

Step 6
Install the Floorboards (5) starting from the footboard and working your way inward.
Metal support leg is adjustable
Step 7
Lower the Slat System (4) and adjust the Metal Support Leg (15) to ensure they are in contact with the
ground. Ensure that the Locking Clip (12) securely attaches to the Locking Pin (10).
2 people are required for this step to ensure equal pressure is placed on the slat system from both sides to
avoid damage.
Step 8
Place mattress directly on top of Slat System (4).

Publicité

loading

Produits Connexes pour Urban Barn Ewan