Step 4
Assemble the Slat System (4) and affix the Metal Support Leg (15) underneath it. Connect the Slat System
(4) to the gas lift mechanism.
Step 5
Attach the Locking Clip (12) to the Slat System (4). On the locking clip, the side with a logo should be
facing outward. Then, install the Locking Pin (10) to the footboard with the arrow facing upward.