Weka SR 25 Notice D'utilisation page 19

Masquer les pouces Voir aussi pour SR 25:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
The SR38/68/75 are fitted with a 3-speed gear box. Besides the three gear speeds, the motor can
additionally be operated in different speeds. Thus the different speeds according to the table below can
be selected.
The speeds of the SR25/65 are only changed via the motor, thereby six motor speeds can be chosen,
which can also be changed while drilling.
3.1
Specifications
Machine type
Nominal voltage
V
Nominal current
A
Nominal power
W
Output power
W
Nominal frequency
Hz
Nominal speeds
1/min 230 -
Drill Ø in concrete
mm
approx.
Weight
kg
Protection class
Tool fixture
Operating data SR25
Speed
1/min
Drill Ø concrete
mm
Water supply
l/min
Operating data SR25 S
Speed
1/min
Drill Ø concrete
mm
Water supply
l/min
Operating data SR38 - Gear step 1
Motor step/Speed
Drill Ø concrete
Water supply
Operating data SR38 - Gear step 2
Motor step/Speed
Drill Ø concrete
Water supply
Operating data SR38 - Gear step 3
Motor step/Speed
Drill Ø concrete
Water supply
Operating data SR38S - Gear step 1
Motor step/Speed
Drill Ø concrete
Water supply
Operating data SR38S - Gear step 2
Motor step/Speed
Drill Ø concrete
Water supply
Operating data SR38S - Gear step 3
Motor step/Speed
Drill Ø concrete
Water supply
SR25
SR25S SR38 SR38S SR 65
230
16
3700
2700
50-60
300 -
180 -
570
740
1370
70 - 370 65 - 300 50 -
400
14,7
14,7
16
Step 1
Step 2
230
280
200 - 370
170 - 310
1,4 -2,0
1,3 - 1,8
Step 1
Step 2
300
360
160-360
130 - 240
1,3 -1,9
1,1 - 1,6
1/min
1/180
mm
400
l/min
2,0
1/min
1/360
mm
190
l/min
1,4
1/min
1/560
mm
120
l/min
1,1
1/min
1/340
mm
280
l/min
1,7
1/min
1/680
mm
100
l/min
1,0
1/min
1/1060
mm
60
l/min
0,8
SR65S
340-
140 - 305 260 - 560 205 - 1370 60 - 360 75 - 460
2580
20-280 125 - 540 80 - 330 50 - 350
18,3
14,7
IP 55
1 1/4" UNC, M33/3
Step 3
Step 4
340
410
140 - 260
110 - 210
1,2 - 1,6
1,0 - 1,5
Step 3
Step 4
430
530
110 - 200
90 - 160
1,0 - 1,4
1,0 - 1,3
2/220
3/260
310
255
1,8
1,6
2/430
3/520
155
130
1,2
1,1
2/670
3/810
100
80
1,0
0,9
2/410
3/490
160
135
1,3
1,2
2/810
3/970
80
70
0,9
0,8
2/1260
3/1520
50
40
0,7
0,6
15
SR68
SR 75
400 3~
15
7500
5700
50-60
150 - 950 120 - 800
16
19,5
Step 5
Step 6
490
570
100 - 180
70 - 150
1,0 - 1,4
0,9 - 1,2
Step 5
Step 6
630
740
75 - 140
60 - 120
0,9 - 1,2
0,8 - 1,1
4/320
5/380
210
175
1,4
1,3
4/630
5/755
105
90
1,0
0,9
4/980
5/1180
70
55
0,8
0,7
4/600
5/715
110
90
1,0
0,9
4/1180
5/1410
60
50
0,8
0,7
4/1840
5/2210
35
30
0,6
0,5
SR75S
6/440
150
1,2
6/880
75
0,9
6/1370
40
0,6
6/835
80
0,9
6/1650
40
0,6
6/2580
20
0,4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sr 38Sr 65Sr 68Sr 75

Table des Matières