ASSEMBLY
INSTALLING THE DISCHARGE CHUTE
See Figure 7.
Place the snow blower so it is resting on its wheels in its
upright position.
z Place the snow discharge chute so it is upside down and
its handle is facing forward as shown.
z Align the holes and insert an adjustment screw from inside
the main discharge chute.
z Place a plastic washer between the main chute and snow
discharge chute.
z Push the screw through the hole in the snow discharge
chute.
z Thread the chute adjusting knob onto the screw.
z Repeat steps for other side.
NOTE: Once both sides are attached, raise the snow
discharge chute to the desired position and hand tighten
the adjusting knobs.
INSTALLING THE LOWER HANDLE
See Figure 8.
z Slide the power cord retainer onto the lower handle.
NOTE: Be sure the eye for the chute control rod is facing
upwards. The power cord retainer can be installed on
either side of the handle. Consider which side of the snow
blower will be closer to the power source to help control
the cord in your work area.
z Align the hole at the bottom of the lower handle to the
hole on the tube frame.
z Insert a screw through the hole of the frame and through
the lower handle.
z Thread the adjustment knob onto the screw. Hand tighten.
z Repeat steps for other side.
INSTALLING THE UPPER HANDLE
ASSEMBLY
See Figure 9.
z Align the bottom hole of the upper handle with the top
hole of the lower handle.
NOTICE
Do not allow the starter cable to be-
come pinched or trapped when aligning the handles.
z Insert a screw through the aligned holes.
z Thread the adjustment knob onto the screw. Hand tighten.
z Repeat steps for the other side.
FIG. 7
E
F
D
A - Snow discharge chute
B - Main discharge chute
C - Adjustment screw
D - Plastic washer
E - Snow discharge chute handle
F - Chute adjusting knob
FIG. 8
A - Lower handle
B - Chute control rod eye
C - Power cord retainer
D - Tube frame
E - Screw
F - Adjustment knob
F
FIG. 9
A - Upper handle assembly
B - Lower handle
C - Screw
D - Adjustment knob
|
11
English
A
C
A
C
E
A
C
D
B
B
D
B