Transport And Storage; Installation - oventrop Hydrocor WM Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Transport and storage

Insulation of the foil
coating
Insulation of the
cover
Storage cylinder
Anode
Operating fluids
Potable water side
Heating side
4.
Transport and storage
Transport the product in its original packaging.
Store the product under the following conditions:
Temperature range
Relative air humidity
Particles
Mechanical influences
Radiation
Chemical influences
5.

Installation

DANGER
Risk of injury from pressurised compo-
nents
f Only carry out work on the heating circuit or
the potable water circuit when the system is
depressurised.
f Observe the permissible operating pressures
during operation.
NOTICE
Damage to property due to lubricants
Seals can be destroyed by the use of grease
or oils.
f If necessary, flush dirt particles and
grease and oil residues out of the pipe-
work.
20
PVC
PS
Steel S235JR enamelled ac-
cording to DIN 4753
Magnesium
Potable water according to
the German Potable Water
Ordinance (TrinkwV)
Heating water according to
VDI 2035
Mixtures of water and glycol
-20°C to +60°C
max. 95%
not condensing
Store dry and free from
dust
Protected from mechani-
cal agitation
Protected from UV rays
and direct sunlight
Do not store together
with solvents, chemicals,
acids, fuels or similar
substances
Observe the maximum tilting height (see sec-
tion 3.3 on page 19) of the storage cylinder
when transporting through doors and narrow-
ings.
Keep a sufficient distance from the wall when setting up
the cylinder. A distance of 300 mm from the wall is suffi-
cient for assembly and subsequent maintenance work.
Make sure there is a sufficient distance from the ceiling
to ensure regular replacement of the anode. The re-
quired distance from the ceiling depends on the size of
the anode (see section 3.3 on page 19).
Illust. 3: Distance in mm for type 120 and 160
Illust. 4: Distance in mm for type 200
1. Set up the storage tank on a level surface with suffi-
cient load-bearing capacity (even when the stor-
age cylinder is full). You can compensate for slight
unevenness using the adjustable feet.
2. Connect the pipework according to Illust. 1 on page
16 and Illust. 2 on page 18.
3. Carry out a leakage test. Carry out the leak test on
the heating side according to DIN EN 14336. Carry
Hydrocor WM
300
300
139501080-V01.10.2020

Publicité

Table des Matières
loading

Table des Matières