Installation
This extractor hood is intended to be
mounted onto the kitchen wall.
1. Remove the grease filter
(refer to Operating Instructions).
2. Draw a line on the wall from the ceiling
to the lower edge of the hood at the
centre of the location where the hood is
going to be mounted.
3. Use the template to mark the points on
the wall where the screws will be moun-
ted. In order to make it easier to hook
the hood onto the screws, draw the out-
line of the area where the hood will be
attached.
Ensure that the minimum distance
between the hob and the extractor hood is
maintained – 550 mm for an electric hob
and 650 mm for a gas hob. The bottom
edge of the template corresponds to the
lower edge of the extractor hood.
4. Drill 4 x l 8 mm holes for the extractor
hood and 2 x l 8 mm holes for the
chimney panelling. Insert plugs into the
holes so that they are flush with the wall.
172
484
96
150
mind. 550 Elektro
mind. 650 Gas
Note: Take into account any special
accessories that are going to be fitted.
5. Screw on the upper and the two lower
fixing brackets.
6. Attach the extractor hood.
Adjust the height and align horizontally
with the adjusting screws.
27