SECTION 3 - PRE-INSTALLATION
3.1 To Setup or Install Safely
!
3.2 Un-Packaging
1.
Immediately upon receiving the unit, carefully examine the carton for damage during transit.
2.
Use lift forks or truck to move
3.
Remove packing material.
4.
Avoid tipping or inverting during handling.
5.
The item serial number, model, and electrical ratings are listed on the nameplate. Record this information in
the Maintenance Record provided in APPENDIX 2: Maintenance Record, or your own preventative maintenance system.
3.3 Tools Required
1.
7/16 Socket or Wrench
2.
9/16 Socket or Wrench
3.
Torque Wrench
The tools above are required for unit assembly.
3.4 Mounting Options
•
Arm-To-Blower Direct Installation: Follow guidelines in APPENDIX 3: Arm-to-Blower Direct Installation.
3.5 Electrical Options
•
Single-Phase Unit: See APPENDIX 1A: Electrical Diagram [120 VAC] Single-Phase Power for wiring
instructions. Have a certified electrician install unit according to local regulations.
•
Do not place unit near flammables or combustible surface.
•
Refer to SECTION 2: Specifications, to know the electrical requirements of the unit
you are installing and ensure adequate input power that is properly sized, rated, and
protected.
•
This unit must be grounded for safe operation.
7