6.3. Connect the thermostat to the gateway.
Cable requirements
Maximum length
Resistance
7. Check the documentation of the boiler and thermostat for more information.
8. Close the gateway:
8.1. Mount the cable strain relief clamps.
8.2. Mount the cover.
8.3. Secure with screw.
9. Apply the sticker on the boiler (part F).
10. Turn on the boiler.
11. Check the following settings of the boiler:
Time of day and date
Hours / minutes
Day / month
Year
DHW
Charging priority:
0 = Absolute
1 = Shifting
2 = None
3 = MC shifting, PC absolute
Only accessible on installer level.
(1)
7640755 - v.08 - 29012020
50 m
2 x 5 Ω
Prog. no.
Standard value
1
01:00 (h:min)
2
01.01 (day.month)
3
2030 (year)
Prog. no.
Standard value
1630
Absolute
(1)
Setting
Current time
Current date
Current year
Setting
Absolute
15