en - Information
1. Parts:
A Gateway
B Screws and plugs 6 mm x 30 mm
C Power adapter
2. Steps:
1. Open the gateway:
1.1. Remove the screw.
1.2. Remove the cover from the gateway.
2. Position and mount the gateway:
2.1. Determine the position of the gateway.
2.2. Drill the 3 marked holes.
2.3. Fit the plugs (part B).
2.4. Secure with screws (part B).
3. Remove the cable strain relief clamps.
4. Switch the boiler off.
5. Available connectors of the gateway.
6. Connect the necessary wires:
6.1. Connect the power adapter.
6.2. Connect the boiler to the gateway:
Cable requirements
Maximum length
Cross-sectional area
7640755 - v.08 - 29012020
D Documentation
E Connector
F Sticker
20 m
80 m
0.8 mm
1.0 mm
2
120 m
1.5 mm
2
2
14